BestsellerStandard panel bracket
Price per unit (typical fascia)
Workhorse rectangular panel-mounted bracket — concealed fixings, fast install, repeatable for retail rollouts.
Manufacturing visibility
Service
Precision offsets for ACM and composite cladding — repeatable fixing centres, gasket paths, wash lighting integration.

Need hoarding, rooftops, or a full façade package alongside this scope? Mention it when you enquire — we route installs with approvals context where required.
2,000+ projects
Retail, F&B, corporate, expo across the UAE and beyond since 2018.
3-day production
Standard signs, lightboxes, and 3D letters — workshop-led, predictable lead times.
3-year warranty
Materials and workmanship — issues resolved at our expense within warranty.
Free quote in 3 hours
Itemised estimate plus free design and 3D visualisation before commitment.
Popular models
The most-requested subtypes — each with its own quote, lead time, and finish options.
BestsellerPrice per unit (typical fascia)
Workhorse rectangular panel-mounted bracket — concealed fixings, fast install, repeatable for retail rollouts.

Price per unit
Circular bracket form — for round logos, badges, and brand marks where the silhouette IS the identifier.

Price per unit
Circular bracket with integrated LED halo — for round brand badges that need night-time presence.

Price per unit
Panel bracket with integrated LED — halo wash, push-through letters, or face-lit logo elements.
How we work
Step-by-step process — predictable timelines, predictable payments.
1–2 days · free
Concept, dimensions, finish palette, 3D render — itemised before any commitment.
1–2 days · free
Substrate check, fixing pattern, power routing, access plan validated on site.
2–7 days · 50% prepay
Workshop fabrication in our Ras Al Khor facility — quality control before shipment.
1–5 hrs · 50% balance
Supervised install, power commissioning, sign-off photos, 3-year warranty starts.
Selected projects
A snapshot of recent work from our portfolio.






Pricing
from
130
AED / unit
* Indicative starting rate — final price comes in the free 3-hour itemised quote.
50% on manufacturing start, 50% on installation completion.
0% interest installment up to 12 months — on request.
UAE permits & compliance
Panel-mounted brackets on ACM and composite cladding require careful coordination with the façade contractor and warranty. We confirm cladding module sizes, anti-galvanic isolation, and vent paths before drilling — and supply touch-up kits matched to coil batches.
Trusted by
Selected brands and projects we have delivered for over the years.










Related services
Adjacent products often commissioned alongside this one.
Signboards Dubai
Monolith builds for storefronts — quick reads at speed and compliant mounting packages.
From 64 AED / sqm
Hoarding & wall graphics Dubai
Construction hoarding wraps with colour-managed print and façade-safe tensioning kits.
From 550 AED / sqm
Neon signs Dubai
High-impact luminous façades & interiors with efficient LED neo-aesthetic assemblies.
From 64 AED / sqm
Lightbox manufacturing Dubai
Even illumination, diffuser grades for UAE UV, repeatable retail rollout builds.
From 131 AED / sqm
Dimensional letters & logos Dubai
Depth, trims, halo or face-lit studies with substrate-aware fixing patterns.
From 1.5 AED / cm
Rooftop signage Dubai
High-level visibility installs engineered for Dubai wind, access plans, and approvals context.
Projects from ~1 555 AED (scope-dependent)
FAQ
Practical questions about estimating, timelines, finishes, and installation.
Stacking changes reaction loads and scaffold plans. Sketches show airflow and diffuser maintenance access before we lock steel orders, so the structural and service implications are visible up front.
Touch-up kits matched to coil batches are supplied with the bracket installation. Concealment trims hide visible fixings wherever the cladding code allows.
We vent cavities and specify breather membranes for coastal-tower exposures. Drainage paths are detailed in the installation drawings and confirmed during commissioning.
Probes confirm substrate hardness; chemical anchors are validated with pull-tests when required by the building owner or authority. We do not penetrate insurance-warranty coatings without sign-off.
5–10 working days for a typical bracket set, depending on finish complexity. PVD or specialist coatings add 3–5 days. Installation slots are booked in parallel against landlord access windows.
In-house fabrication, reliable materials, and install-ready coordination from brief to completion.
Call +971 52 363 5858