Manufacturing visibility

1Sign Dubai

Sign manufacturing in Dubai — built in our workshop, delivered with permits.

Since 2018, 1Sign has shipped 2,000+ signage projects across the UAE — from cafe neon to skyline rooftop installations. One bilingual delivery team owns every brief from estimate to commissioning.

  • 2,000+

    Projects shipped since 2018

  • 3 days

    Standard production lead time

  • 3 hrs

    Free itemised quote on weekdays

  • 3 yrs

    Warranty on materials & workmanship

Ras Al Khor Industrial Area 2 — workshop and showroom under one roof

Our Ras Al Khor workshop houses CNC routers, metal forming, neon-bending stations, paint cabin, print stations, and the assembly floor where every cabinet, lightbox, and 3D-letter set is built. Showroom samples are kept at the entrance — book a slot and we'll walk you through finishes, LED options, and material grades in person.

Night-window installation and rooftop crane operations are scheduled out of the same facility, so the same project manager who quoted your job is on radio with the install crew.

1Sign Dubai

Ras Al Khor Industrial Area 2, Dubai, United Arab Emirates

Open in Google Maps →
1Sign workshop in Ras Al Khor — fabrication floor with metal forming and assembly stations

Brief to commissioned install — handled by one team

  1. 01

    Brief & free quote

    You drop site photos, brand kit, rough sizing. We respond within 3 weekday hours with an itemised BoQ — materials, fabrication, drivers, mounting, installation lines all separated.

  2. 02

    Design & 3D visualisation

    Free design pass with 3D render placed on a real photo of your façade or interior. Sign-off triggers a fixed manufacturing date — no creep on materials or sizes once the render is approved.

  3. 03

    Manufacturing

    Standard items ship in 3 working days. Premium finishes (PVD, brass, custom moulds) add 3–5 days. 50% prepay starts the production slot.

  4. 04

    Installation & sign-off

    Supervised on-site install with our crew, sign-off photos at completion, and the 3-year warranty starts. 50% balance due on installation completion. 0% installments up to 12 months on request.

The people who own your project, end to end

Eight Dubai-based specialists across sales, design, project management, and production — no handoff between contractors.

  • Aram Balayan — CEO

    Aram Balayan

    CEO

  • Andrey Ivanov — CAM designer

    Andrey Ivanov

    CAM designer

  • Pavel Khvosch — Designer

    Pavel Khvosch

    Designer

  • Konstantin Sheyko — Project manager

    Konstantin Sheyko

    Project manager

  • Michael Tsarkov — Senior project manager

    Michael Tsarkov

    Senior project manager

  • Konstantin Nozhov — Production manager

    Konstantin Nozhov

    Production manager

  • Sahaya Eremeeva — Project manager

    Sahaya Eremeeva

    Project manager

  • Julia Ushak — Head of sales

    Julia Ushak

    Head of sales

Approvals workflow handled, UAE-wide

We routinely prepare submission packs and coordinate with these UAE authorities and free-zone bodies.

  • Dubai Municipality

    Signage permit submissions and approvals workflow

  • TRAKHEES (Ports & Free Zones)

    Approvals workflow for free-zone tenants

  • Dubai Civil Defence

    Electrical and lighting compliance for façade signage

  • DDA / DMCC / DIFC

    Free-zone landlord coordination & permits

Trusted by

Selected brands and projects we have delivered for over the years.

  • Sber
  • MegaFon
  • Wildberries
  • Ozon
  • Lamoda
  • SDEK
  • Ducati
  • Myata
  • Renaissance
  • Old Boy

Book a showroom slot — material samples and finishes in person

1Sign Dubai

Ras Al Khor Industrial Area 2, Dubai, United Arab Emirates